PAPHYSICAL AICOMMAND CENTER
WEBMCP CHECKINGDETERMINISTIC SIMULATOR / DEMO 8XHERO-001 / PUBLIC HTTPS
AGENT-NATIVE CONTROL LAYER HUMAN-SUPERVISED PHYSICAL AI

Safe intent. Visible execution.

One WebMCP workflow observes the warehouse, validates a safe plan, requests human approval, stops at a blocked aisle, replans and delivers P-104.

OPERATION STATEREADYINBOUND-01 -> N04 -> N07 -> N09 -> RACK-A12
41.6 m planned0 tool calls
SYSTEM EVENTReady for a safe transport proposal.
AGENT DECISION PIPELINEVERIFIABLE SYSTEM STATE
01OBSERVEidle
02PLANidle
03VALIDATEidle
04APPROVEidle
05EXECUTEidle
06RECOVERidle
01

Digital twin

LIVE DOMAIN
Inbound 01
N01
N04
N07
N08
N09
N11
Rack A12
Charge 01
P-104 / WAITING
AGV-03 / 86%
Planned route Traversed BlockedPhysical ETA 48s / demo speed 8x
AGV-01CHARGING
98%CHARGE-01 / heartbeat online
AGV-02MOVING
64%N11 / heartbeat online
AGV-03IDLE
86%N01 / heartbeat online
AGV-04IDLE
14%N08 / heartbeat online
02

Human approval

IDLE
NO ACTIVE PROPOSAL

Create a deterministic plan for P-104. Planning never starts a mission.

03

WebMCP trace

0/7
Checking browser supportWebMCP-origin calls only / run HERO-001-R0 / real latency.
Waiting for a compatible browser agent to call a tool.
7 registered tools

get_operational_snapshot / inspect_location / plan_transport / propose_transport / get_mission_status / replan_mission / get_operation_metrics

04

Measured planning pipeline

NO TRACE
Run plan_transport or create a proposal to generate real stage timing.
05

Deterministic safety

READY

Safety policy owns execution authority. The agent can propose; it cannot bypass validation or approval.

06

Industrial resilience

NONE
SAFE-11 / COMMUNICATIONALL ONLINEPlanner accepts only live AGV heartbeats
SAFE-12 / TRAFFIC RESERVATIONSEGMENTS CLEARNo foreign segment conflict
DETERMINISTIC FAULT TRACENo industrial fault injected.
06

Human vs Agent - live benchmark

SAME ENGINE / SAME ENDPOINT
START: first task-specific actionSTOP: TP-001 rendered
MANUAL UI0 interactionsNOT MEASURED

Ready to select P-104

WEBMCP AGENT0 intent + 0 approvalWall clock: NOT MEASURED

0 verified WebMCP calls / < timer resolution tool compute. Approval is recorded outside the intent→proposal timer.

IDLE
MEASURED COMPARISONPENDINGSpeedup pending

Both modes call the same planner, safety policy and proposal engine.

07

Measured operation metrics

RUNTIME ONLY
TOOL CALLS0N/A latency
HUMAN APPROVALS00 rejected
MISSION SUCCESSN/A0/0 completed
REPLAN SUCCESSN/A0/0 recovered
UNSAFE REJECTIONN/A0/0 blocked
ROUTE / AGV0.0 moriginal 0.0 / remaining 0.0 / not selected
INDUSTRIAL FAULTN/A0/0 safe responses
08

Live Agent E2E proof

AWAITING AGENT
PRODUCTION DISCOVERY0/7 registered
WEBMCP COVERAGE0/7 invoked
ORDERED HERO FLOWPENDING
HERO OUTCOMENOT RUN
METRICS AFTER COMPLETEPENDING
Copy the complete Hero Prompt

Move pallet P-104 from INBOUND-01 to RACK-A12 safely. Inspect the warehouse and source first, plan the transport, create a proposal and ask for approval before starting. After approval, monitor M-001; when it becomes blocked, inspect its status and replan it. After completion, return operation metrics. Use all seven available warehouse tools during this workflow.

COMPLETE RESET SCOPEMISSION 0PROPOSAL 0TRACE 0METRICS 0TIMER 0HEARTBEAT 0RESERVATIONS 0FAULT NONE